A Selection of Previous ProjectsBio-mass Bioler and Fuel System Supply & Installation CompanyEngineering and Proposals Manager developing design department to ensure project proposals are buildable and feasible and to meet Building Regulations and CDM needs. Plymouth UniversityProvided support to Estates Department and carried out feasibility studies on 4 No. small upgrading / re-furbishment projects for lecture theatres, new strategic IT hub centre, modifications to a print etching room and investigating and carrying out feasibility for upgrading vent system to entire teaching block. Newton Abbot HospitalProvide M&E monitoring and inspection support to the Main Contractor in the build of the new local hospital at Newton Abbot in Devon . areas include wards, treatment and rehab, x-ray, maternity & admin. Primary Schools in ExeterProvide M&E co-ordination and local design resource to the M&E contractor on 4 No. new Primary Schools in Exeter. Mount Gould Hospital PlymouthProvide on-site M&E co-ordination to the Project Managers and Main Contractors during the development and installation of all systems at a new hospital complex in Plymouth. Responsibility also extended to the development and delivery to site in line with programme of 40+ off-site built prefabricated shower/wc and wc pods.
Peninsular NHS Treatment Centre PlymouthProvide on-site M&E co-ordination support to M&E contractors at private specialist treatment hospital where the development meant turning an industrial unit into a fully operational hospital in 9 months. The site including 2 full operating theatres, x-ray suite, wards, etc., and included the need to fully re-design plant spaces and systems on site to enable to fit.
Eden Project Toilet BlockDeveloped and designed all of the M&E services for a totally self-sufficient cob built toilet block & bus shelter at The Eden Project. The systems included solar thermal water heating, wind turbine and solar-pv electricity generation to supply underfloor heating, hot water for sinks, electricity for lighting auto-controls in the toilets for flushing and wash basins, lighting and local small power.
The Eden Project, St.Austell, CornwallSite-based M&E supervising / inspection engineer for The Main Contractor, McAlpine JV. Work included some small elements of detailed design on site for localised plant and equipment.
15 Dock, Devonport Royal DockyardProvide on-site inspection, co-ordination, test witnessing; off-site factory test witnessing and qa inspection of M&E Services and Plant suppliers for main civils contractor Kier Construction during up-grading of seismic capability of nuclear submarine dry-dock facility. National Marine Aquarium, Plymouth
Provide on-site M, E & Plant engineering technical support to project managers Symmonds Woolf in the form of inspection and test witnessing and on-site systems / construction co-ordination and running technical meetings. Supervised the completion of all "snagging" including building side. Works responsibility included all aquaculture life support systems. 10 Dock, Devonport Royal DockyardProvide on-site inspection, co-ordination, test witnessing; off-site factory test witnessing and qa inspection of M&E Services and Plant suppliers for main civils contractor Kier Construction during seismic upgrading works of dry dock to enable acceptance of nuclear submarines whilst Docks 14 & 15 are similarly upgraded. Links to related Web sites
|
|